Customization: | Available |
---|---|
After-sales Service: | Engineers at Spots All Over The World |
Warranty: | 1 Y After Operating or 12+1.5 M After Delivery |
Still deciding? Get samples of US$ 220000/Set
Request Sample
|
Suppliers with verified business licenses
Split Mountain KJ310,is a track mounted,electro-hydraulic mining development drill rig,designed for inclined drifts drilling on slope with gradeability near 25 degrees. With fast and accurate drilling, this mining drill rig lowers waste development costs and minimizes dilution while offering a safe and ergonomic workplace for both operators and service personnel. Combination of efficient rock drill, robust boom and advanced controls, the mining drill rig will meet even the most challenging requirements.
Technical Specifications
Hydraulic Drifter/Rock Drill | Control System | ||
Type | HC109 | Anti-jamming control | Yes |
Percussion power | 18.8kW | Rotation control | Adjustable/Reversible |
Percussion pressure | Max. 135 bar | Flushing control | Water flow and pressure |
Percussion rate | 47Hz | Percussion control | Adjustable power |
Rotation torque | 780 Nm | Voltage | 24V |
Hole size (bolting) | ∅42-102 mm | Carrier | |
Shank adapter | T45 / R38 male | Type of carrier | Track / Crawler |
Boom | Tracks | triple grouser, sealed and lubricated | |
Parallel holding | Complete | Width | 305 mm / 12 in |
Lifting angle | Up55°,down 16° | Cummin engine QSB-C80-31 | 60 kW,Tier 3 |
Swing | left 35°,right 35° | Transmission | Double-speed motor |
Extension | 1600 mm | Tramming speed | Max.2.5 km/h |
Feed extension | 1200 mm | High gear | Max.2.5 km/h |
Feed roll-over angle | 360° Rotaty Actuator | Low gear | 1.2 km/h |
Hydraulic System | Hydraulic jacks, front | 2 extendable | |
Powerpack | 1 x 55 kW | Oscillation angles | +/- 10° |
Percussion pump | 100 cc (variable) | Gradeability / sideways tilt | Max. 25° / 5° |
Rotation pump | 55 cc (gear) | Ground clearance | 180 mm |
Filtration | 10 µ | Centralized greasing points | 8 ports |
Oil tank volume | 200 liters | Air And Water System | |
Cooler for hydraulic oil | Oil-to-water 1 x 30 kW | Flushing | By water |
Electric System | Water pump capacity | 50 l/min | |
Standard voltages | 380 - 690 V (± 10%), 50 or 60 Hz | Rock drill oil consumption | 180 - 250 g/h |
Total installed power | 70 kW | Rock drill air consumption | 300 l/min |
Batteries(Chargeable) | 2 x 12 V, 80 Ah | Air compressor | 0.5 m³/min (7 bar) |
Cable Reel | 80m-100m | Overall with rods 3m,others depending on options. | |
Cable reel lubrication | Manual | Weight | 12000 kg |
Cable reel mud clean | Manual | Transport length | 10700 mm |
Front lights | 6 x 50W LED (4200 lm, 6000 K) | Tramming / drilling width | 1650 mm / 2300 mm |
Rear lights | 4 x 50W LED (4200 lm, 6000 K) | Tramming / drilling height | 1880 mm / 2480 mm |
Percussion hour meters | Optional | Turning width(T-section) | 2800 mm |
Operator remote control | Optional | Turning radius(Inner/Outter) | R3263 / R5400 mm |